Today I separated two four by four sheets of plywood from two 2x8x10 pressure treated framing pieces. The bottom framing had plenty of rot. The old dock started on four floating logs. After thirty years the logs struggle to float.
The fasteners were serrated nails. One year ago I ripped my hand using a crow bar to attempt nail removal. Today I drilled around the nails to weaken the plywood and then freed the plywood. Framing timbers have no intention of releasing the nails.
This demolition proceeds at a snails pace.
