Thursday, May 23, 2024

An update, wound and windows.

 The installation of  five replacement windows is complete. That was a scheduled project.  Not on the schedule was a bloody left hand. 

Healing time on the worst deep scrap will be at least two weeks.  Two other wounds are closer to the garden variety. 

Do  not push on a wreaking bar when attempting to remove  nails. The heads bent and I was flying into water toward a submerged log. My hand came up with significant blood. My head and face stopped somehow in a safe zone. 

What is the project? Four large parallel logs are covered by cross parallel 2x8 planks.  The dock top layer is six sheets of four foot by eight foot plywood.  I was going step by step to renovate the submerged dangerous thing.  YOU NEED TO SEE IT.