Saturday, September 26, 2020

Annual task complete. The camp water is out.

This year I took the water out in two steps. A week ago I took the intake nozzle out of the lake.  I wade into the water out to the nozzle flotation wood cross.  Anchored by a concrete block, I lift the brick up from the muck and carry everything to the dock.  The water is so low I am only briefly up to my waist.  Quickly I return to thigh, knee and calf depth.

Today I drained all interior faucets and lines.  That still involves crawling under the camp in two locations. Head room is okay yet.  Yet meaning I will reach an age where someone younger should do the work.