Camp. Opening camp before summer.
Yesterday we took items to and returned items from camp.
Each winter camp is empty and alone. My non standard task yesterday was to lower the grade where the pump and expansion tank sits. As I connect the water I must crawl under a porch. With passing years the ground level moved up so the expansion tank needs more head room. I hit frost at three inches so I still need warmer temperatures to get the frost out of the ground. Further digging must wait for another three to four weeks.
Check back then.
